CFD of fire and smoke in buildings, sheds, pavilions, industrial and mining plants, oil and gas platforms and hangars. Visibility, temperature, gases and smoke extraction, with a report for the fire brigade.

Results accepted and approved by the technical staff of the São Paulo fire brigade, including a work that had been embargoed.

Aerospace · Mining · Oil and gas · Civil construction · Other sectors

Visibility in an exhibition pavilion at 3,600 s of fire
Visibility in an exhibition pavilion, 3,600 s after the start of the fire, with a heat release rate of 8,000 kW.
  • Approved by the fire brigadeExhibition pavilion in São Paulo: the work was embargoed, and the project was approved after the CFD study.
  • Alternative solutionsStudies that propose alternatives to the prescriptive technical instructions, with the safety demonstrated.
  • Visibility on four facesVisibility evaluated on the four faces of the pavilion up to 3,600 s after the start of the fire.
  • Escape routesVisibility, temperature and gases along the escape routes.
  • Client testimonial“…results accepted and approved, including, by the technical staff of the São Paulo fire brigade.” Carlos Cotta Rodrigues, CEO, Carlos Cotta Engenharia.

Complete studies, from the fire scenario to the report for the fire brigade

We prefer whole projects to isolated simulations: ATS issues the study and the documents, and your team reviews and submits.

Smoke control

Extraction, supply and pressure differential, with the position and flow of the smoke-evacuation fans.

Tenability of the escape routes

Visibility, temperature and gases along the escape routes, over time.

Alternative solution

When the prescriptive instruction does not fit the building, we propose an alternative and show it is safe.

Need only a part? We define the scope with you.

What you receive

Fire and smoke spread

Spread based on the heat release rate (HRR) of the fire scenario.

Extraction and pressure differential

Control of smoke with extraction and pressure differential between spaces.

Visibility, temperature and gases

Along the escape routes, over time.

Smoke evacuation

Position and flow of the fans.

Alternative solutions

Alternatives to the prescriptive technical instructions.

Report for the fire brigade

Criteria of visibility and temperature, and the documentation to submit.

How ATS studies fire and smoke

The scenario

Place of the fire, materials, HRR curve and ventilation conditions. The fire is defined by its heat release rate, and the smoke and heat follow from it.

The simulation

Smoke, heat and visibility in time, with CFD, in the geometry of the building and with its extraction and supply systems.

Where it applies

Buildings, sheds, pavilions, industrial and mining plants, oil and gas platforms and hangars.

Tools, and where each one fits

Tools serve the engineering work. We say what each one does in the project.

ToolRole in the projectStatus
CFD++Fluid flow, heat transfer, combustion and particles in 3D. ATS is the exclusive CFD++ representative in Brazil.Licensed
Tecplot 360 EXPost-processing and automation macros, including erosion rate calculation.Licensed

Evidence you can check

Studies submitted to the fire brigade.

Project work

Building model for a smoke and heat study
Building model of the smoke and heat study in a commercial complex.

How an engagement runs

  1. Scenario

    Place of the fire, materials, HRR curve and ventilation conditions.

  2. Model

    Geometry of the building, mesh and extraction and supply systems.

  3. Simulation

    Smoke, heat and visibility in time, with CFD.

  4. Report

    Criteria of visibility and temperature and the documentation for the fire brigade.

Questions engineers ask before they hire us

Does the fire brigade accept CFD studies?

Our studies were accepted and approved by the technical staff of the São Paulo fire brigade, including for a work that had been embargoed.

Can you propose an alternative to the technical instruction?

Yes. Alternative solutions to the prescriptive technical instructions are part of what we analyze.

What do you need to start?

The drawings, the use of the space, the materials and the fire scenario, or we define the scenario with you.

Who submits the documents?

ATS issues the study and the report. Your team reviews and submits.

Is our data kept confidential?

Yes. We work under NDA, and your design data and reports stay with you.

Need to approve a smoke control project?

Tell us your case. An ATS engineer replies.

Emailsales@aerothermalsolutions.co
Phone+55 11 3854-4224
OfficeAv. Pompéia, 634, cj. 107, São Paulo, SP, Brazil.

An ATS engineer replies. We work under NDA.

Two ways to contract: by package, for a defined scope and number of cases, or by hour, for open scope. An hourly contract can become a package.